Close Menu
arabianfeature.comarabianfeature.com
    What's Hot

    Saudi Arabia’s Midad Energy emerges as frontrunner for Lukoil’s $22bn assets

    December 17, 2025

    ‘Sound. Elevated.’ from Bang & Olufsen marks centennial

    December 17, 2025

    DMCC signs Crypto.com deal to push blockchain into commodities trading

    December 17, 2025
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    arabianfeature.comarabianfeature.com
    Subscribe
    • Home
    • CEOs
    • Women
    • AI & Tech
    • Magazine
    • Real Estate
    • Luxury
    • Feature
    arabianfeature.comarabianfeature.com
    Home » Dubai unveils major Al Wasl Road upgrade: 15km development to cut travel times in half and boost capacity
    CEOs

    Dubai unveils major Al Wasl Road upgrade: 15km development to cut travel times in half and boost capacity

    Arabian Media staffBy Arabian Media staffJune 5, 2025No Comments6 Mins Read
    Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email
    Share
    Facebook Twitter LinkedIn Pinterest Email


    The Roads and Transport Authority (RTA) has announced an integrated project to upgrade Al Wasl Road.

    The initiative also aims to address urban expansion, accommodate population growth, and enhance the quality of life for both residents and visitors.

    Al Wasl Road Dubai traffic plan

    The development spans 15 km, from the intersection with Umm Suqeim Street to the junction with 2nd December Street in Dubai.

    It includes the upgrade of six intersections, comprising enhancements to one junction and the construction of five tunnels totalling 3.85km.

    The street will be widened from two to three lanes in each direction. The project is expected to reduce travel times along Al Wasl Road by 50 per cent and increase capacity from 8,000 to 12,000 vehicles per hour in both directions.

    Mattar Al Tayer, Director General, Chairman of the Board of Executive Directors of the Roads and Transport Authority, said: “Al Wasl Road Development Project forms part of a master plan developed by the RTA to upgrade the road network in the area, which also includes enhancements to Umm Suqeim and Al Safa Streets.

    “These projects are designed with a focus on creative and aesthetic elements, incorporating dedicated pedestrian walkways, cycling tracks, boulevards, and vibrant urban public spaces that promote community interaction.

    “The plan also features decorative landscaping and the creation of dynamic urban environments. The project serves a vital district that offers a broad array of modern tourism and lifestyle destinations, including beaches, luxury hotels, fine dining venues, and residential neighbourhoods, home to over one million residents”.

    The project involves the development of Al Wasl Road from its intersection with Umm Suqeim Street to its junction with 2nd December Street, spanning a total length of 15 km.

    The street will be widened from two to three lanes in each direction. It also includes the upgrade of six intersections along Dubai’s Al Wasl Road, specifically at:

    • Al Thanya
    • Al Manara
    • Umm Al Sheif
    • Umm Amara
    • Al Orouba
    • Al Safa Streets

    This will be achieved through the construction of five tunnels with a total length of 3.85km.

    Al Tayer said: “The intersection with Al Thanya Street will undergo improvements, while a unidirectional tunnel will be constructed at the intersection with Al Manara Street. This tunnel will consist of three lanes and branch into two separate routes: two lanes from Sheikh Zayed Road to Jumeirah Street, and two lanes from Sheikh Zayed Road to Umm Suqeim Street, with a total capacity of 4,500 vehicles per hour.

    “The project also includes a tunnel on Umm Al Sheif Street, comprising two lanes in the direction from Sheikh Zayed Road to Jumeirah Street. This tunnel will be 750m long and will accommodate up to 3,200 vehicles per hour.

    “In addition, a tunnel will be constructed at the intersection of Al Wasl Road with Umm Amara Street, featuring two lanes in each direction, with a total length of 700m and a combined capacity of 6,400 vehicles per hour”.

    The project includes the construction of a unidirectional tunnel at the intersection of Al Wasl Road with Al Orouba Street, heading towards Jumeirah Street.

    The tunnel will be 625m long, with two lanes and a capacity of 1,400 vehicles per hour. It also entails the construction of a tunnel at the intersection of Al Wasl Road with Al Safa Street, measuring 750 metres in length and featuring two lanes in each direction, with an estimated total capacity of 6,400 vehicles per hour.

    Al Tayer added: “The project will also convert the Al Satwa roundabout into a signalised junction and implement surface-level enhancements at five intersections along Jumeirah Street, including upgrades to the traffic signal control system.”

    The Al Wasl Road Development Project complements the master plan previously announced by RTA, which includes the upgrade of Umm Suqeim Street from its intersection with Jumeirah Street to its junction with Al Khail Road.

    Once complete, this upgrade will increase the street’s capacity from 12,000 to 16,000 vehicles per hour in both directions.

    It will also improve traffic flow and reduce travel time along the stretch between Jumeirah Street and Al Khail Road, from 20 minutes to just 6 minutes.

    The corridor serves a wide range of residential and development zones, with an estimated population exceeding two million residents.

    The project also encompasses the development of six intersections along Umm Suqeim Street at:

    • Jumeirah Street
    • Al Wasl Road
    • Sheikh Zayed Road
    • First Al Khail Road
    • Al Asayel Street
    • Al Khail Road

    It includes the construction of four bridges and three tunnels, totalling 4.1km in length. A tunnel will be built at the intersection of Umm Suqeim Street with Jumeirah Street, comprising two lanes in each direction, along with a signalised surface-level junction.

    Another tunnel will be constructed at the intersection with Al Wasl Road, featuring two lanes in the direction from Sheikh Zayed Road to Jumeirah Street, while maintaining seamless surface-level flow towards Sheikh Zayed Road in Dubai.

    The project also includes the construction of two bridges at the intersection of Umm Suqeim Street with Sheikh Zayed Road, designed to eliminate traffic weaving and overlap at the existing junction.

    As part of our master plan to upgrade #Dubai’s road network, #RTA has announced an integrated project to upgrade Al Wasl Street, covering Umm Suqeim and Al Safa Streets. The development spans from the intersection with Umm Suqeim Street to the junction with 2nd December Street.… pic.twitter.com/ejiWawFFZi

    — RTA (@rta_dubai) June 3, 2025

    Additionally, a tunnel will be built at the intersection of Umm Suqeim Street with First Al Khail Road to facilitate traffic flow from Al Barsha towards Sheikh Zayed Road, accompanied by surface-level enhancements at the intersection.

    The project further involves the addition of a new lane on Umm Suqeim Street from its intersection with First Al Khail Road to Al Asayel Street, increasing the total to four lanes in each direction.

    Moreover, two elevated ramps will be constructed at the intersection with Al Khail Road:

    • The first will connect Al Khail Road to the Al Quoz Industrial Area
    • The second will facilitate traffic movement from Umm Suqeim Street to Al Khail Road in the direction of Deira

    The RTA is currently undertaking the development of Umm Suqeim Street from its intersection with Al Khail Road to its junction with Sheikh Mohammed bin Zayed Road, extending further to the intersection with Emirates Road.

    The scope of work includes the upgrade of the intersection with Al Barsha South through the construction of an 800-metre tunnel featuring four lanes in each direction, alongside a signalised surface-level intersection.

    The project also involves the upgrade of major intersections along Al Qudra Road—starting from its intersection with Sheikh Mohammed bin Zayed Road, passing through Sheikh Zayed bin Hamdan Al Nahyan Street, and continuing to Emirates Road.

    This phase includes the development of several intersections, the construction of bridges totalling 2,700 metres in length, and the upgrade and widening of the existing street along an 11.6 km stretch.

    Upon completion, this stage of the project will significantly enhance street’s capacity and reduce travel time from 9.4 minutes to just 2.8 minutes.





    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
    Previous ArticleSharjah real estate: Alef breaks ground on $300m Al Mamsha Raseel development
    Next Article Huda Kattan reclaims full ownership of Huda Beauty, ending TSG Consumer partnership
    Arabian Media staff
    • Website

    Related Posts

    A&S Investment Holding Chairman Ugur Akkus Sets Dubai Real Estate Record With Luxury Penthouse Purchase

    November 23, 2025

    Khazna: Egypt’s Digital Banking Revolution

    October 18, 2025

    Aldar announces final phase of Athlon community with 1,200 new apartments

    September 11, 2025
    Add A Comment
    Leave A Reply Cancel Reply

    Top Posts

    10 Trends From Year 2020 That Predict Business Apps Popularity

    January 20, 2021

    Shipping Lines Continue to Increase Fees, Firms Face More Difficulties

    January 15, 2021

    Qatar Airways Helps Bring Tens of Thousands of Seafarers

    January 15, 2021

    Subscribe to Updates

    Get the best of Arab culture, lifestyle, and stories . Straight to your inbox. Subscribe to Arabian Feature and never miss a beat.

    Arabian Feature is your window into the heart of the Arab world. We bring you inspiring stories, fresh perspectives, and unique voices from across the region—covering culture, lifestyle, people, and progress. Bold, curious, and proudly Arab.

    Facebook X (Twitter) Instagram Pinterest YouTube
    Top Insights

    Top UK Stocks to Watch: Capita Shares Rise as it Unveils

    January 15, 2021
    8.5

    Digital Euro Might Suck Away 8% of Banks’ Deposits

    January 12, 2021

    Oil Gains on OPEC Outlook That U.S. Growth Will Slow

    January 11, 2021
    Get Informed

    Subscribe to Updates

    Get the best of Arab culture, lifestyle, and stories . Straight to your inbox. Subscribe to Arabian Feature and never miss a beat.

    @2025 copyright by Arabian Media Group
    • Home
    • About Us

    Type above and press Enter to search. Press Esc to cancel.